Leveling compound is being laid in preparation for the tile flooring.
Piping has been installed to run water to the new baptismal font.
A couple holes have been dug outside as we try to mitigate the water in the ductwork issue.
Leveling compound is being laid in preparation for the tile flooring.
Piping has been installed to run water to the new baptismal font.
A couple holes have been dug outside as we try to mitigate the water in the ductwork issue.